Skip to content
Dispatch Report

Nepal's hydropower surplus is real, and so is the problem of selling it

In the wet season the grid has more electricity than the country can use. Transmission, not generation, is now the bottleneck.

?

By Anonymous

1 min read

Share:XFacebookWhatsAppEmail
Illustration for: Nepal's hydropower surplus is real, and so is the problem of selling it
Illustration for: Nepal's hydropower surplus is real, and so is the problem of selling itPhoto: Dispatch Report graphic

A decade ago load-shedding was a daily fact. Today the utility reports surplus generation through the monsoon months and has begun selling power across the border. (‘A Year in’)

The surplus is seasonal: run-of-river plants produce most when the rivers are high and least in the dry winter, when demand peaks.

Wires and storage

The two answers are cross-border lines big enough to carry the wet-season surplus, and storage, either reservoirs or batteries, to shift it into winter. Both are expensive and both take years. (‘World Energy Outlook’)

Meanwhile the domestic market is being nudged upward: electric cooking, electric vehicles and industrial tariffs that reward using power when it is plentiful.

References

  1. A Year in Review. Nepal Electricity Authority, 2024. www.nea.org.np. Accessed 26 June 2026.

  2. World Energy Outlook 2024. International Energy Agency, 2024. www.iea.org/reports/world-energy-outlook-2024. Accessed 26 June 2026.

Cite this story

Dispatch Report (2026) ‘Nepal's hydropower surplus is real, and so is the problem of selling it’, 26 June. Available at: https://thedispatchreport.com/article/nepals-hydropower-surplus-is-real-and-so-is-the-problem-of-selling-it (Accessed: 5 October 2026).

The accessed date is today's.

0 comments

Log in to join the discussion.

Create an account

More from Business